EXTECH Constructions Pty. Ltd. installation team has a vast experience in the residential building field.
EXTECH organizes the preparation of the roof and ceiling on the existing building to receive the New 1ST Floor Addition and the Structural Engineer inspects the preparation work prior to installation.
Delivery is carried out by our own trucks, craned into position and EXTECHS experienced installation team secures and weatherproofs your new 1st floor addition in a matter of hours.
Services are connected within 24 hours and the staircase installed a few days later with the total installation time of approximately 2 weeks.
Keeping the entire operation under our Supervision enables a smooth transition for your 1st floor addition.